How we strengthen our young engineering team
1st & 2nd week
Basic Concepts for Railway signalling1st & 2nd week
Principles of Interlocking, Standard of Interlocking, Classification of stations, G&SR and SEM
3rd week
Preparation of Signalling3rd week
Preparation of Signalling Plan (SIP) and Checking of P.way Plan (ESP).
4th week
Preparation of Table of Control4th week
Preparation of Table of Control for 3-Road station (TOC).
5th – 7th week
Designing of Circuit Diagram (3-Road station PI).5th – 7th week
- Push Button Circuits
- Route selection (LR) and Point selection (NWR/RWR) circuits.
- Point Operation & Detection (NWKR/RWKR).
- Route checking (UCR) and ASR circuits.
- Singal control (HR).
- Lamp circuits and all other panel indication circuits in Indian Railway.
8th & 9th week
Designing of outdoor particulars.8th & 9th week
- Track Binding diagram.
- Cable path (Route) diagram.
- Cable core (distribution) diagram.
- Cable Termination particulars.
- Location Box Particulars.
- Out door particulars.