Ongoing Projects

Preparation/ Designing of Signalling Plans, Outdoor Circuits (Signals, Points & Tracks) and all outdoor particulars for the following projects.

RE doubling works between:

  • Vijayawada – Motur : 40 Km
  • Moturu – Undi : 40 Km
  • Undi – Nidadavolu : 30 Km

Third line works between:

  • Gudur – Vijayawada : 240 Km
  • Vijayawada – Kondapalli : 20 Km
  • Vijayawada – Duvvada : 250 Km

New Line between Nadikudi – Srikalahasti Section

  • New Piduguralla
  • Nekerakallu
  • Rompicharalla
  • Savalyapuram

Doubling between Guntur – Nandyala section.

  • Nallapadu
  • Pericherla
  • Phirangipuram
  • Nudurupadu
  • Satuluru
Completed Projects

‘UCR’ and ‘HR’ circuits for easy maintenance for VIJAYAWADA Division (approximately 50 stations/ cabins).

Panel Interlocking: provision of ‘BPAC’- 2 station.

RE Doubling: Venkatachalam Road Jn – Krishnapatnam section.

Additional Loop facilities: Elamanchili.

New BG Line: JPTN- Mattampally section.

VIJAYAWADA Jn: Route Relay Interlocking for

  • KCC- BZA Automatic Section.
  • G- Cabin
  • F- Cabin
  • West Inter Cabin
  • Bulb Cabin
  • VNC Cabin and
  • RRI Cabin outdoor particulars.

OFC & 6Qd Cable path diagrams for

  • MTMI – JPTN Section
  • Karepalli – Singareni
  • Sanathnagar – Ammanaguda
  • JKN – Bodan

Land Boundary Drawings for approximately 2000.00 Km

  • VIJAYAWADA Division : 900 Km.
  • GUNTUR Division          : 607 Km.
  • GUNTAKAL Division     : 485 Km.

VIJAYAWADA: RRI outdoor work.