Preparation/ Designing of Signalling Plans, Outdoor Circuits (Signals, Points & Tracks) and all outdoor particulars for the following projects.
RE doubling works between:
- Vijayawada – Motur : 40 Km
- Moturu – Undi : 40 Km
- Undi – Nidadavolu : 30 Km
Third line works between:
- Gudur – Vijayawada : 240 Km
- Vijayawada – Kondapalli : 20 Km
- Vijayawada – Duvvada : 250 Km
New Line between Nadikudi – Srikalahasti Section
- New Piduguralla
- Nekerakallu
- Rompicharalla
- Savalyapuram
Doubling between Guntur – Nandyala section.
- Nallapadu
- Pericherla
- Phirangipuram
- Nudurupadu
- Satuluru
‘UCR’ and ‘HR’ circuits for easy maintenance for VIJAYAWADA Division (approximately 50 stations/ cabins).
Panel Interlocking: provision of ‘BPAC’- 2 station.
RE Doubling: Venkatachalam Road Jn – Krishnapatnam section.
Additional Loop facilities: Elamanchili.
New BG Line: JPTN- Mattampally section.
VIJAYAWADA Jn: Route Relay Interlocking for
- KCC- BZA Automatic Section.
- G- Cabin
- F- Cabin
- West Inter Cabin
- Bulb Cabin
- VNC Cabin and
- RRI Cabin outdoor particulars.
OFC & 6Qd Cable path diagrams for
- MTMI – JPTN Section
- Karepalli – Singareni
- Sanathnagar – Ammanaguda
- JKN – Bodan
Land Boundary Drawings for approximately 2000.00 Km
- VIJAYAWADA Division : 900 Km.
- GUNTUR Division : 607 Km.
- GUNTAKAL Division : 485 Km.